Wednesday, April 09, 2025

  • RSS
  • Design and Simulation:These are some books which are recommended as a reading list. 1- Aerodynamics of Road Vehicles from Fluid Mechanics to Vehicle Engineering. Edited by Wolf-Heinrich Hucho 2- Hucho-Aerodynamik des Automobils Stromungsmechanik.Warmetechnik. Fahrdynamiik.Komfort
  • Optimizing Performance and Fuel Economy of a Dual-Clutch Transmission Powertrain with Model-Based Design.
  • Wind Turbine DesignPrimary objective in wind turbine design is to maximize the aerodynamic efficiency, or power extracted from the wind. But this objective should be met by well satisfying mechanical strength criteria and economical aspects. In this video we will see impact of number of blades, blade shape, blade length and tower height on wind turbine design.
  • Modelling Complex Mechanical Structures with SimMechanicsModeling physical components or systems in Simulink® typically involves a tradeoff between simulation speed and model fidelity or complexity: the higher the fidelity of the model, the greater the effort needed to create it..
  • Biomass Energy Vs. Natural GasIn 2009, natural gas prices plunged to below $4 per MMBtu where many "Experts" are saying that prices will remain low for decades as a result of technology break-throughs allowing for sizable increases in natural gas supply for North America. The Energy Information Agency (EIA) just released data projections reflecting this potential increased supply in natural gas.
Require content

Tuesday, 27 October 2015

Could Hinkley C spell the end of EDF?

Posted by Sohail Azad On 03:48

EDF's apparent obsession with continuing with the increasingly financially toxic European Pressurised Reactor (EPR) programme by building another two units at Hinkley C could spell doom for EDF. Further drastic losses on Hinkley C similar to the mounting losses accrued by AREVA and EDF on the EPRs being built in Finland (Olikuoto) and France (Flamanville) might lead to what hitherto has seemed unthinkable - the break up of EDF. At least a major sell-off of assets seems almost certain if EDF is to...

Wednesday, 21 October 2015

Hinkley C - no progress in two years

Posted by Sohail Azad On 13:54

The only successful thing about the Hinkley C project is the management of the news to imply that there has been progress in the project. In fact there has been absolutely no progress, certainly not in the financial terms, and in many ways things have got worse. That is compared to two years ago when the UK Government's much criticised terms, for paying EDF �94 per MWh (2015 prices) for 35 years underpinned by a 60 per cent loan guarantee by the Treasury, were given state aid clearance by the EU...

Thursday, 15 October 2015

One line or multiple lines . . . That is the question!

Posted by Sohail Azad On 16:16

All of us have been taught that having a system with one line is �better� than having dedicated lines (one per server). Engineers are taught about this in almost every Operations Research course, in almost every University around the world. Indeed, Queuing Theory provides strong support for this �fact�. It can be �demonstrated� that the average wait time for customers in the one line setting is far less than the average wait time for customers in...

Sunday, 11 October 2015

Government heading for electricity capacity price crisis in 2019

Posted by Sohail Azad On 04:27

As Conservatives gear up for the next election they could be hit by a electricity crisis as the costs of subsidies for new gas power stations escalate in 2019. This is because of a triple failure of policy; its failure to realise that its nuclear power objectives are undeliverable, the failings of its 'capacity mechanism' which beckon an escalation in costs in 2019, and a failure to promote decentralised energy solutions that would avoid these problems. To cap it all, as the Conservatives implement...